The Precedent

  • March 31An Aviation Affair (PROM) April 23 2016

End of bell conundrum?

End of bell conundrum?

JJ Fought, Staff reporter

November 13, 2019

November marks the fourth month school has been in session and the fourth month of school, the bells are still out of sync. The bell system still running with little consistency. The new bell system was introduced to the new C-building and it is ran over IP meaning it is controlled and troubleshoote...

GRIDLOCKED: School adjusting to new building

GRIDLOCKED: School adjusting to new building

Alexander Connors, Staff Reporter

August 30, 2019

After a year of construction, the new wing to the C-building has finally opened, allowing teachers to have their own classrooms and students to have more room inside their classes. Many problems arose, such as water leaks, bats, noises, and even damage to the existing C-building. Many people are beg...

The student voice of Perry High School
Christine Gonzales